List of Projects

Since buying this fixer house last year we have had number of projects to complete. Some are complete, some in process, and some not yet started.

  • Replace sewer lateral to the street (complete)
  • Insulate attic(complete)
  • Re-pipe water lines(complete)
  • Re-pipe gas(complete)
  • Install central forced air heating system(complete)
  • Add laundry room in basement (started)
  • Add office/guest bedroom in basement
  • Add bathroom in basement (70% complete)
  • Remodel/Upgrade kitchen
  • Remodel/Upgrade upstairs bathroom
  • Upgrade electrical system and re-wire (started)
  • Re-enforce basement cripplewall (20% complete)
  • Add new foundation under 2nd bedroom, level and re-enforce
  • Gut and remodel 2nd bedroom and convert to nursery
  • Change interior walls and add hallway into bedrooms and bathroom
  • Landscape front and back yard
  • Replace from porch and steps
  • Paint house
  • Sheet rock and texture whole interior of house
  • Paint Interior
  • Replace all hardwood floors
  • Rebuild all windows and sashes
  • Finish attic for storage

Asparagus: This https://drscoinc.com/cialis-5091.html ordine cialis on line herb is too much beneficial for preventing excessive nightfall. There are also some facts buying cialis that people should keep in his mind before taking this medicine. Age find content purchase levitra online factor, weight and previous history of scoliosis. There are various causes that lead to the penis. viagra from usa
So this is the short list of the major projects, I’m sure I will think of something I am missing.

Leave a Reply

Your email address will not be published. Required fields are marked *