Our first major project for the house in Alameda is to replace the sewer lateral. It is a city requirement that when title is transferred on an old house the sewer lateral needs to be tested and replaced if necessary.
When we purchased the house we were given an estimate of $5000.00 to replace the lateral. We plan to complete it ourselves and save a few thousand bucks.
We have started with the first step in replacing the sewer lateral from where it exits the house to the connection at the street. The pipe consists of 100 year old terracotta clay sections buried up to 4 feet deep. You can see it is above my waist in the photo and I am 6’3″ tall. We had to remove 40 feet of concrete sidewalk and dig a trench about 55 feet long. There are a number of joints that have been infiltrated by tree roots causing clogs and sewer to leach out into the ground.
You can see more photos here.
Health concerns It causes potential harm to every have a peek here viagra on line organ of the body, increasing the risk of infection and slowing the recovery rate from any medical procedure. Cheap kamagra is extremely efficient to cure cialis viagra generico any genital disease of men. The medicine solboards.com vardenafil india was 15.00 dollar per pill where the levitra named as Kamagra sells at $ 1.00 per pill. You can make use sildenafil online canada of Korean ginseng with any other herbal cures. Our next step is to remove the old pipe and install 4″ black ABS plastic pipe in place of the old clay pipe. we will get to that in the next couple of days.
Cost so far:
City Permit = $129.30
Concrete cutting and removal = $475.00
Hired labor for digging the trench down to the pipe = $400.00